{"id":5183,"date":"2026-03-26T10:50:00","date_gmt":"2026-03-26T10:50:00","guid":{"rendered":"https:\/\/tiagorcorreia.com\/tmp-en-4668\/"},"modified":"2026-11-12T15:26:33","modified_gmt":"2026-11-12T15:26:33","slug":"five-phases-real-estate-project","status":"publish","type":"post","link":"https:\/\/tiagorcorreia.com\/en\/five-phases-real-estate-project\/","title":{"rendered":"The five phases of a real estate project: from feasibility to delivery"},"content":{"rendered":"<div class=\"trc-art-meta\"><span><strong>Process<\/strong><\/span><span>3 min read<\/span><span>Updated October 2026<\/span><\/div>\n<p>Every real estate project \u2014 from a single house to a multi-unit development \u2014 goes through the same five phases. What sets the successful ones apart is the order of the decisions: each phase answers a question, and skipping questions is at the root of a large share of delays and cost overruns. Here is the full journey, from idea to delivery.<\/p>\n<h2>1. Feasibility \u2014 what is possible, and for how much<\/h2>\n<p>Everything starts with the right question: what can this plot or building become? Reading the PDM (municipal master plan) and the constraints, the indices, the programme scenarios and the first numbers. It is the lowest-cost phase of the whole process \u2014 and the one that most shapes the financial outcome. This is where a purchase is negotiated well or an expensive mistake avoided; it is precisely the work of <a href=\"\/en\/landscope-feasibility-analysis-real-estate\/\">LANDSCOPE<\/a>.<\/p>\n<h2>2. Design \u2014 from concept to detail<\/h2>\n<p>Brief, preliminary study, developed design and detailed design, with the engineering disciplines coordinated from early on. The golden rule of 2026: with prior control reduced and <a href=\"\/en\/rgeu-revoked-what-rules-now\/\">the RGEU still in force<\/a> until the new technical rules, the rigour of the design is the client&#8217;s main protection \u2014 and the quality of the detailed design is what keeps the construction budget on track.<\/p>\n<h2>3. Permitting \u2014 the right route, complete at first submission<\/h2>\n<p>Planning permission, prior notification or exemption: the route determines deadlines and risk. With DL 108\/2026 in force since 1 October 2026, deadlines shorten and technical responsibility increases \u2014 the <a href=\"\/en\/building-permitting-portugal-2026-guide\/\">complete permitting guide<\/a> explains the whole framework.<\/p>\n<h2>4. Construction \u2014 building what was designed<\/h2>\n<p>Specifications, careful selection of the contractor, a clear contract \u2014 and technical assistance from the design team through to the end. Overruns almost always stem from incomplete designs or improvised changes; a well-prepared construction phase is boring, and that is how it should be.<\/p>\n<h2>5. Delivery and value \u2014 the asset at work<\/h2>\n<p>Use permit, certifications, as-built drawings \u2014 and the product on the market. For a full cycle, plan for 24 to 48 months depending on scale; the numbers behind all of this are in the article on <a href=\"\/en\/irr-roi-real-estate-development\/\">IRR and ROI<\/a>. In a housing development these phases scale up: see <a href=\"\/en\/housing-developments-2026-feasibility\/\">feasibility and framework for housing developments<\/a>.<\/p>\n<blockquote>\n<h2 class=\"title\">&ldquo;The five phases are not bureaucracy in series \u2014 they are five questions in the right order. Whoever answers them out of order pays to answer them twice.&rdquo;<\/h2>\n<h3>Tiago R. Correia<\/h3>\n<p>Architect<\/p><\/blockquote>\n<div class=\"trc-art-faq\"><span class=\"trc-art-label\">Frequently asked questions<\/span><\/p>\n<h3>Can I shorten the process?<\/h3>\n<p>You can cut the dead time \u2014 a complete application, disciplines in parallel, a strategic prior information request (PIP) \u2014 but not the phases. Skipping feasibility or saving on the detailed design usually proves expensive.<\/p>\n<h3>When should I involve the architect?<\/h3>\n<p>Before buying: phase 1 exists to protect the acquisition decision. After the deed, the room to optimise has already shrunk.<\/p>\n<h3>Does the process change for rehabilitation?<\/h3>\n<p>The phases are the same, with a reinforced diagnosis in phases 1 and 2 \u2014 including, where applicable, the <a href=\"\/en\/seismic-vulnerability-assessment\/\">seismic vulnerability assessment<\/a>.<\/p>\n<\/div>\n<div class=\"trc-lead\" id=\"pedido\"><span class=\"trc-lead-kicker\">Request a proposal<\/span><h3 class=\"trc-lead-title\">What phase is your project in?<\/h3><p class=\"trc-lead-text\">From feasibility to delivery, we follow the full cycle \u2014 and we can step in at any phase with a diagnosis of what was left undone in the previous ones.<\/p>\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f5817-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"5817\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/5183#wpcf7-f5817-o1\" method=\"post\" class=\"wpcf7-form init wpcf7-acceptance-as-validation\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"5817\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.2.5\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f5817-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<div class=\"trc-lf\">\n<div class=\"trc-lf-row\"><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"name\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Name*\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><\/div>\n<div class=\"trc-lf-row\"><span class=\"wpcf7-form-control-wrap\" data-name=\"your-contact\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Email or phone*\" value=\"\" type=\"text\" name=\"your-contact\" \/><\/span><\/div>\n<div class=\"trc-lf-row trc-lf-msg\"><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"3\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"What you need and where* (e.g. a plot bought in Torres Vedras, no design yet)\" name=\"your-message\"><\/textarea><\/span><\/div>\n<div class=\"trc-consent\"><span class=\"wpcf7-form-control-wrap\" data-name=\"gdpr-consent\"><span class=\"wpcf7-form-control wpcf7-acceptance\"><span class=\"wpcf7-list-item\"><label><input type=\"checkbox\" name=\"gdpr-consent\" value=\"1\" aria-invalid=\"false\" \/><span class=\"wpcf7-list-item-label\">I have read and accept the <a href=\"\/en\/privacy-policy\/\">Privacy Policy<\/a><\/span><\/label><\/span><\/span><\/span><\/div>\n<div class=\"trc-lf-actions\"><input class=\"wpcf7-form-control wpcf7-submit has-spinner trc-lf-btn\" type=\"submit\" value=\"Request a proposal\" \/><\/div>\n<\/div><span class=\"trc-hp\" aria-hidden=\"true\" style=\"position:absolute!important;left:-10000px!important;width:1px!important;height:1px!important;overflow:hidden!important;\"><label>Website <input type=\"text\" name=\"_trc_url\" value=\"\" tabindex=\"-1\" autocomplete=\"off\"><\/label><\/span><input type=\"hidden\" name=\"_trc_t\" value=\"\"><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<p class=\"trc-lead-alt\">Prefer to talk now? <a href=\"tel:+351918660664\">+351 918 660 664<\/a><span aria-hidden=\"true\"> \u00b7 <\/span><a href=\"mailto:geral@tiagorcorreia.com\">geral@tiagorcorreia.com<\/a><\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Process3 min readUpdated October 2026 Every real estate project \u2014 from a single house to a multi-unit development \u2014 goes through the same five phases. What sets the successful ones apart is the order of the decisions: each phase answers a question, and skipping questions is at the root of a large share of delays [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4918,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[122],"tags":[],"class_list":["post-5183","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-real-estate-investment"],"_links":{"self":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts\/5183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/comments?post=5183"}],"version-history":[{"count":4,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts\/5183\/revisions"}],"predecessor-version":[{"id":6044,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts\/5183\/revisions\/6044"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/media\/4918"}],"wp:attachment":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/media?parent=5183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/categories?post=5183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/tags?post=5183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}