{"id":5770,"date":"2026-09-11T17:38:05","date_gmt":"2026-09-11T17:38:05","guid":{"rendered":"https:\/\/tiagorcorreia.com\/new-rjue-portugal-1-october-2026\/"},"modified":"2026-09-11T17:38:05","modified_gmt":"2026-09-11T17:38:05","slug":"new-rjue-portugal-1-october-2026","status":"publish","type":"post","link":"https:\/\/tiagorcorreia.com\/en\/new-rjue-portugal-1-october-2026\/","title":{"rendered":"New RJUE: what changes from 1 October 2026"},"content":{"rendered":"<div class=\"trc-art-meta\"><span><strong>Legislation &amp; Permitting<\/strong><\/span><span>8 min read<\/span><span>Updated October 2026<\/span><\/div>\n<p>The revision of the Legal Regime for Urbanisation and Building (RJUE, the Portuguese statute that governs planning and building control), approved by <strong>Decree-Law n.\u00ba 108\/2026, of 29 May<\/strong>, entered into force on <strong>1 October 2026<\/strong>. It is the largest change to the permitting of building works in recent years and it changes how a building is notified, permitted and used. This article explains, in plain language, what has applied since that date and \u2014 above all \u2014 what happens to applications already submitted to the municipality.<\/p>\n<div class=\"media\"><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/09\/trc-novo-rjue-1-outubro-2026.webp\" alt=\"Building under construction in Lisbon \u2014 new RJUE in force from 1 October 2026\" loading=\"lazy\"><\/div>\n<div class=\"trc-art-summary\"><span class=\"trc-art-label\">The essentials in 30 seconds<\/span><\/p>\n<ul class=\"list\">\n<li><strong>In force since 1 October 2026<\/strong> \u2014 postponed from 3 August by DL 155-B\/2026.<\/li>\n<li><strong>Prior notification becomes full assumption of responsibility<\/strong> \u2014 the municipality assesses it in a single step.<\/li>\n<li><strong>The use permit gives way to a prior notification<\/strong> (or one with a time limit, with inspection).<\/li>\n<li><strong>The \u00abalvar\u00e1\u00bb (permit certificate) gives way to an operation title<\/strong>, enforceable against third parties and valid in deeds.<\/li>\n<li><strong>The stage on 1 October is what counts<\/strong> \u2014 it decides whether your application follows the new rules or the old ones.<\/li>\n<\/ul>\n<\/div>\n<h2>When it entered into force (and why it was postponed)<\/h2>\n<p>The date of entry into force was <strong>1 October 2026<\/strong>. It was not always so: Decree-Law n.\u00ba 108\/2026 itself provided for entry into force \u00abon the first working day of the third month following its publication\u00bb (article 13), which pointed to <strong>3 August 2026<\/strong>. That deadline was deferred by <strong>Decree-Law n.\u00ba 155-B\/2026, of 31 July<\/strong>, to give municipalities time to adapt their procedures and IT platforms and to complete the supplementary regulations.<\/p>\n<p>On that same date, <strong>Portaria n.\u00ba 320\/2026\/1<\/strong> (the ministerial order implementing the new regime) also came into force; it regulates several essential aspects of the new regime \u2014 from the application forms to the documents required for submission. Until 30 September 2026, the previous regime applied. What changes in the submission to the municipality is explained in <a href=\"\/en\/portaria-320-2026-what-changes\/\">Portaria 320\/2026: what changes in the application to the municipality<\/a>.<\/p>\n<div class=\"trc-diagram\"><span class=\"trc-art-label\">The reform timeline<\/span><\/p>\n<div style=\"display:flex;flex-wrap:wrap;gap:18px 20px;\">\n<div style=\"flex:1 1 140px;border-top:1px solid var(--trc-line);padding:14px 0 4px;\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.6px;text-transform:uppercase;color:var(--trc-soft);margin:0 0 8px;\">01 \u00b7 Publication<\/p>\n<p style=\"font-size:21px;line-height:1.2;font-weight:600;color:var(--trc-ink);margin:0 0 6px;\">29 May 2026<\/p>\n<p style=\"font-size:13.5px;line-height:1.45;color:var(--trc-soft);margin:0;\">of DL 108\/2026<\/p>\n<\/div>\n<div style=\"flex:1 1 140px;border-top:1px solid var(--trc-line);padding:14px 0 4px;\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.6px;text-transform:uppercase;color:var(--trc-soft);margin:0 0 8px;\">02 \u00b7 Postponement<\/p>\n<p style=\"font-size:21px;line-height:1.2;font-weight:600;color:var(--trc-ink);margin:0 0 6px;\">31 Jul 2026<\/p>\n<p style=\"font-size:13.5px;line-height:1.45;color:var(--trc-soft);margin:0;\">by DL 155-B\/2026<\/p>\n<\/div>\n<div style=\"flex:1 1 140px;border-top:1px dashed var(--trc-line);padding:14px 0 4px;\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.6px;text-transform:uppercase;color:var(--trc-soft);margin:0 0 8px;\">03 \u00b7 Initial date<\/p>\n<p style=\"font-size:21px;line-height:1.2;font-weight:600;color:var(--trc-soft);text-decoration:line-through;margin:0 0 6px;\">3 Aug 2026<\/p>\n<p style=\"font-size:13.5px;line-height:1.45;color:var(--trc-soft);margin:0;\">no longer applies<\/p>\n<\/div>\n<div style=\"flex:1 1 140px;border-top:2px solid var(--trc-ink);padding:14px 0 4px;\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.6px;text-transform:uppercase;color:var(--trc-soft);margin:0 0 8px;\">04 \u00b7 Entry into force<\/p>\n<p style=\"font-size:21px;line-height:1.2;font-weight:600;color:var(--trc-ink);margin:0 0 6px;\">1 Oct 2026<\/p>\n<p style=\"font-size:13.5px;line-height:1.45;color:var(--trc-soft);margin:0;\">with Portaria 320\/2026\/1<\/p>\n<\/div>\n<\/div>\n<\/div>\n<p class=\"trc-art-caption\">The timeline worth fixing: from publication to the effective start of the new rules.<\/p>\n<p>A note for readers: the two articles we have already published on this reform \u2014 the analysis of the <a href=\"\/en\/new-rjue-dl-108-2026-five-changes\/\">five structural changes for real estate development<\/a> and the guide to the <a href=\"\/en\/new-building-permitting-rules-2026\/\">new permitting rules for private owners<\/a> \u2014 date from June, before this postponement. Where the dates differ, this one is correct.<\/p>\n<h2>What changes, in plain language<\/h2>\n<p>The stated aim of the decree is \u00abto make procedures more flexible, speed up deadlines, clarify concepts and ensure the existence of legally secure titles\u00bb. In practice, for those who build or rehabilitate, this is what changes:<\/p>\n<div style=\"background:var(--trc-oatmeal);color:var(--trc-ivory);border-radius:12px;padding:6px 28px;margin:20px 0 8px;\">\n<div style=\"padding:22px 0;border-bottom:1px solid rgba(235,234,228,0.22);\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.8px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 14px;\">Prior notification<\/p>\n<div style=\"display:flex;flex-wrap:wrap;gap:16px;align-items:stretch;\">\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:rgba(235,234,228,0.55);margin:0 0 5px;\">Before<\/p>\n<p style=\"margin:0;color:rgba(235,234,228,0.85);font-size:15px;line-height:1.55;\">A mainly formal check of the documents submitted.<\/p>\n<\/div>\n<div style=\"flex:0 0 24px;display:flex;align-items:center;justify-content:center;color:var(--trc-ivory);font-size:22px;font-weight:700;\">&rarr;<\/div>\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 5px;\">From 1 October<\/p>\n<p style=\"margin:0;color:#ffffff;font-size:15px;line-height:1.55;font-weight:600;\">Full assumption of responsibility by the applicant; the municipality assesses formal and substantive validity <strong>in a single step<\/strong>.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"padding:22px 0;border-bottom:1px solid rgba(235,234,228,0.22);\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.8px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 14px;\">Use permit<\/p>\n<div style=\"display:flex;flex-wrap:wrap;gap:16px;align-items:stretch;\">\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:rgba(235,234,228,0.55);margin:0 0 5px;\">Before<\/p>\n<p style=\"margin:0;color:rgba(235,234,228,0.85);font-size:15px;line-height:1.55;\">A stand-alone act authorising use \u2014 the \u00abuse permit\u00bb.<\/p>\n<\/div>\n<div style=\"flex:0 0 24px;display:flex;align-items:center;justify-content:center;color:var(--trc-ivory);font-size:22px;font-weight:700;\">&rarr;<\/div>\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 5px;\">From 1 October<\/p>\n<p style=\"margin:0;color:#ffffff;font-size:15px;line-height:1.55;font-weight:600;\">Becomes a <strong>prior notification<\/strong> (or a prior notification with a time limit, which allows an inspection).<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"padding:22px 0;border-bottom:1px solid rgba(235,234,228,0.22);\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.8px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 14px;\">Operation title<\/p>\n<div style=\"display:flex;flex-wrap:wrap;gap:16px;align-items:stretch;\">\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:rgba(235,234,228,0.55);margin:0 0 5px;\">Before<\/p>\n<p style=\"margin:0;color:rgba(235,234,228,0.85);font-size:15px;line-height:1.55;\">Alvar\u00e1 (permit certificate).<\/p>\n<\/div>\n<div style=\"flex:0 0 24px;display:flex;align-items:center;justify-content:center;color:var(--trc-ivory);font-size:22px;font-weight:700;\">&rarr;<\/div>\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 5px;\">From 1 October<\/p>\n<p style=\"margin:0;color:#ffffff;font-size:15px;line-height:1.55;font-weight:600;\">An <strong>operation title<\/strong>, setting out the characteristics of the works, enforceable against third parties and valid in deeds and registrations.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"padding:22px 0;border-bottom:1px solid rgba(235,234,228,0.22);\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.8px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 14px;\">Permitting deadlines<\/p>\n<div style=\"display:flex;flex-wrap:wrap;gap:16px;align-items:stretch;\">\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:rgba(235,234,228,0.55);margin:0 0 5px;\">Before<\/p>\n<p style=\"margin:0;color:rgba(235,234,228,0.85);font-size:15px;line-height:1.55;\">An overall deadline indexed to the construction area.<\/p>\n<\/div>\n<div style=\"flex:0 0 24px;display:flex;align-items:center;justify-content:center;color:var(--trc-ivory);font-size:22px;font-weight:700;\">&rarr;<\/div>\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 5px;\">From 1 October<\/p>\n<p style=\"margin:0;color:#ffffff;font-size:15px;line-height:1.55;font-weight:600;\">The overall deadline ends; <strong>interim deadlines<\/strong> return, with tacit approval adjusted to complexity.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"padding:22px 0;\">\n<p style=\"font-size:11px;font-weight:700;letter-spacing:1.8px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 14px;\">Reconstruction works<\/p>\n<div style=\"display:flex;flex-wrap:wrap;gap:16px;align-items:stretch;\">\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:rgba(235,234,228,0.55);margin:0 0 5px;\">Before<\/p>\n<p style=\"margin:0;color:rgba(235,234,228,0.85);font-size:15px;line-height:1.55;\">A blurred boundary with extension.<\/p>\n<\/div>\n<div style=\"flex:0 0 24px;display:flex;align-items:center;justify-content:center;color:var(--trc-ivory);font-size:22px;font-weight:700;\">&rarr;<\/div>\n<div style=\"flex:1 1 200px;\">\n<p style=\"font-size:10px;font-weight:700;letter-spacing:1.2px;text-transform:uppercase;color:var(--trc-ivory);margin:0 0 5px;\">From 1 October<\/p>\n<p style=\"margin:0;color:#ffffff;font-size:15px;line-height:1.55;font-weight:600;\">Clarified: reinstating the last valid precedent is <strong>exempt<\/strong>; if it increases volume or area, it is an extension.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p class=\"trc-src\">Source: <a href=\"https:\/\/diariodarepublica.pt\/dr\/detalhe\/decreto-lei\/108-2026-1128002421\" target=\"_blank\" rel=\"noopener\">Decree-Law n.\u00ba 108\/2026, of 29 May (Di\u00e1rio da Rep\u00fablica)<\/a>.<\/p>\n<h3>Prior notification is no longer a \u00abprior control\u00bb<\/h3>\n<p>The decree acknowledges what was already the practice: prior notification was not a true prior control, because the municipality only checked that the documents had been submitted, without assessing their content. It is now based on an <strong>effective assumption of responsibility<\/strong> by the applicant \u2014 for the submission and for compliance with the rules \u2014 and the municipal assessment, where there is one, covers the operation as a whole, in a single step. Most operations in areas with defined planning parameters may be carried out by prior notification, without depending on an administrative act.<\/p>\n<p>If you are unsure which procedure applies to your works, the article <a href=\"\/en\/planning-permission-or-prior-notification\/\">planning permission or prior notification<\/a> remains the starting point \u2014 bearing in mind that the boundary between the two regimes shifts with this revision.<\/p>\n<h3>Use is now notified<\/h3>\n<p>One of the points with the greatest day-to-day impact: buildings or units whose works were permitted, notified or exempted following a <a href=\"\/en\/prior-information-request-pip-portugal\/\">prior information request (PIP)<\/a> become subject to a <strong>prior notification<\/strong> for the purposes of use; in the remaining cases, to a <strong>prior notification with a time limit<\/strong>, which allows the municipality to carry out an inspection. In practice, what was known as the \u00abuse permit\u00bb ceases to be a stand-alone act and is now notified.<\/p>\n<h3>The title is once again a document with content<\/h3>\n<p>The reform rejects the idea that a mere proof of self-assessed payment of fees can serve as a title. It reinstates the concept of the <strong>title<\/strong> as a document that describes the operation \u2014 to provide legal certainty and to serve as evidence before third parties, including in deeds and registrations. The alvar\u00e1 thus gives way to the title of the respective operation.<\/p>\n<h3>Reconstruction and rehabilitation: clearer boundaries<\/h3>\n<p>For those who rehabilitate, there are useful clarifications. Reconstruction remains exempt from planning permission or prior notification, but only as the <strong>reinstatement of the last valid precedent<\/strong>; if it adds volume or area, it is an extension and follows that regime. The exemption now covers the reconstruction of buildings in the protection zones of listed buildings, and the replacement of window frames with others of identical design that improve energy efficiency becomes a work of minor planning relevance. A change to the design made <strong>after<\/strong> the works have been carried out must be treated as a legalisation, under the terms of municipal regulations.<\/p>\n<h3>RGEU and technical rules<\/h3>\n<p>The decree provides for the revocation of the General Regulation of Urban Buildings (RGEU), but <strong>with effect from the entry into force of the future decree that sets out the technical building standards<\/strong> (article 25) \u2014 in other words, there was no revocation on 1 October. We follow this point in the article <a href=\"\/en\/rgeu-revoked-what-rules-now\/\">The RGEU remains in force: its revocation has been postponed<\/a>.<\/p>\n<h2>What happens to an application already submitted<\/h2>\n<p>It is the question the practice has received most since the change of regime. The answer lies in <strong>article 12 (\u00abApplication in time\u00bb)<\/strong> of Decree-Law n.\u00ba 108\/2026:<\/p>\n<ul class=\"list\">\n<li>The new regime applies to procedures <strong>started after the decree&#8217;s entry into force (1 October 2026)<\/strong>.<\/li>\n<li>It <strong>also<\/strong> applies to procedures already started which, on that date, are still at the <strong>preliminary check and screening<\/strong> stage (article 11 of the RJUE). In those cases, the applicant may carry out the acts necessary to adapt the application to the new regime.<\/li>\n<li>Applications that on 1 October have already passed that stage follow, as a rule, the previous regime.<\/li>\n<li>The rules on nullity and lapse periods apply to situations already constituted, unless, under the old law, the period ends earlier; in that case, they are counted from 1 October.<\/li>\n<\/ul>\n<p>In the experience of those who prepare these applications, the dividing line \u2014 whether or not the application is still at the preliminary check and screening stage on 1 October \u2014 is what determines, in most cases, whether the application \u00abjumps\u00bb to the new rules or remains under the old ones. If you had an application submitted before that date, it is worth confirming what stage it was at on 1 October.<\/p>\n<h2>What to do now<\/h2>\n<p>There is no single answer, and be wary of anyone who gives one. It depends on the type of operation, the municipality, the applicable parameters and the stage the application was at on 1 October. As a general guide:<\/p>\n<ul class=\"list\">\n<li>An application submitted now follows the new regime and is prepared using the forms and documents required by Portaria n.\u00ba 320\/2026\/1.<\/li>\n<li>If your application was still at the preliminary check and screening stage on 1 October, it moved to the new regime and you may adapt it \u2014 it is worth assessing whether this works in your favour, for example if the operation can now proceed by prior notification in an area with defined parameters.<\/li>\n<li>If it had already passed that stage, it follows, as a rule, the previous regime.<\/li>\n<li>In any case, the decision should be taken case by case, with the application on the table.<\/li>\n<\/ul>\n<p>Before buying a plot or moving forward with a property, this framing analysis is exactly what we do in <a href=\"\/en\/landscope-feasibility-analysis-real-estate\/\">LANDSCOPE<\/a>: telling you what can be built and by which route, before you invest. Alongside this, other 2026 regimes with weight on the final bill remain in force, such as <a href=\"\/en\/6-percent-vat-construction-2026-guide\/\">6% VAT on construction<\/a>.<\/p>\n<div class=\"trc-art-faq\"><span class=\"trc-art-label\">Frequently asked questions<\/span><\/p>\n<h3>When did the new RJUE enter into force?<\/h3>\n<p>On 1 October 2026. The initial date was 3 August 2026, but it was postponed by Decree-Law n.\u00ba 155-B\/2026, of 31 July.<\/p>\n<h3>Does the use permit come to an end?<\/h3>\n<p>It ceases to be a stand-alone act. Use now takes place under a prior notification or, in other cases, under a prior notification with a time limit, which allows an inspection by the municipality.<\/p>\n<h3>Does the alvar\u00e1 disappear?<\/h3>\n<p>The alvar\u00e1 gives way to an operation title \u2014 a document that describes the works and serves as evidence before third parties, including in property transactions.<\/p>\n<h3>I have an application already submitted. Do the old rules or the new ones apply?<\/h3>\n<p>It depends on the stage on 1 October. If it is still at the preliminary check and screening stage, the new regime applies (with the possibility of adapting the application); if it has already passed that stage, it follows, as a rule, the previous regime (article 12).<\/p>\n<h3>Did the RGEU stop applying on 1 October?<\/h3>\n<p>No. The revocation of the RGEU only takes effect when the decree setting out the new technical building standards enters into force.<\/p>\n<\/div>\n<div class=\"trc-art-cta\"><span class=\"trc-art-cta-title\">Do you have an application under way or works to start this autumn?<\/span><\/p>\n<p>Send us the property tax document (caderneta predial) and the current stage of the application, and we will tell you, specifically, what changes in your case and the best time to submit.<\/p>\n<p><a class=\"trc-art-btn\" href=\"\/en\/contact\/\">Talk to the practice<\/a><\/div>\n<p class=\"trc-src\">Official sources: <a href=\"https:\/\/diariodarepublica.pt\/dr\/detalhe\/decreto-lei\/108-2026-1128002421\" target=\"_blank\" rel=\"noopener\">Decree-Law n.\u00ba 108\/2026<\/a> \u00b7 <a href=\"https:\/\/files.diariodarepublica.pt\/1s\/2026\/07\/14705\/0000200003.pdf\" target=\"_blank\" rel=\"noopener\">Decree-Law n.\u00ba 155-B\/2026<\/a> \u00b7 <a href=\"https:\/\/files.diariodarepublica.pt\/1s\/2026\/07\/14700\/0003500087.pdf\" target=\"_blank\" rel=\"noopener\">Portaria n.\u00ba 320\/2026\/1<\/a> (Di\u00e1rio da Rep\u00fablica).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Legislation &amp; Permitting8 min readUpdated October 2026 The revision of the Legal Regime for Urbanisation and Building (RJUE, the Portuguese statute that governs planning and building control), approved by Decree-Law n.\u00ba 108\/2026, of 29 May, entered into force on 1 October 2026. It is the largest change to the permitting of building works in recent [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5500,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[126],"tags":[],"class_list":["post-5770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legislation-permitting"],"_links":{"self":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts\/5770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/comments?post=5770"}],"version-history":[{"count":0,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/posts\/5770\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/media\/5500"}],"wp:attachment":[{"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/media?parent=5770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/categories?post=5770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tiagorcorreia.com\/en\/wp-json\/wp\/v2\/tags?post=5770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}