In Portugal, in most cases they fall between 3% and 12% of the estimated construction cost — and the exact figure depends on complexity, size and the phases contracted.
Since liberalisation there are no mandatory fee tables: the percentage is agreed case by case. Fees follow the real scale of what is being designed.
The order of the maths: fees are set from the construction cost — and it is precisely the architect’s work that keeps that cost within budget.
The most common and transparent method — fees follow the real scale of what is being designed.
Agreed upfront from the brief. Full predictability on well-defined projects.
For consultancy, technical opinions and small interventions — typically €50 to €150/hour.
A complete contract covers the base brief, the preliminary study, licensing (including submitting the process to the council), the execution design and technical assistance on site.
Always confirm separately: engineering (structure, services, thermal, acoustic), topographic survey, geotechnical study and site supervision — comparing proposals is only honest when it compares the same scope.
Phased with the work: a payment on appointment and instalments per completed phase.
They were abolished under competition law: each practice sets its own fees freely. Transparency today lives in the contract — scope, phases, deliverables and the calculation basis in writing.
You can, but it rarely pays off: the execution design is what protects the construction budget, and technical assistance is what ensures what was designed is what gets built.
No — they are phased with the work: typically a payment on appointment and instalments per completed phase (preliminary study, licensing, execution, construction).
For smaller interventions a fixed fee or hourly rate is common, because the percentage of a small job does not cover the real technical hours.
Send us the site and the brief. We’ll come back with an estimate of fees, timelines and scope — no obligation.