Fees

Architect’s fees

What a project costs — and what it gives back.

In Portugal, in most cases they fall between 3% and 12% of the estimated construction cost — and the exact figure depends on complexity, size and the phases contracted.

60+
completed projects
15
years of practice
16
municipalities
1
point of contact, from concept to site
From concept to construction

Cheap fees with a narrow scope are the most expensive deal in construction: what you save on the design you pay for on site, with interest.
Tiago R. Correia · Architect

How it’s calculated

A percentage of the construction cost — the most common and transparent method.

Since liberalisation there are no mandatory fee tables: the percentage is agreed case by case. Fees follow the real scale of what is being designed.

From the works to the fee

Example from our guide — a 200 m² house

6–8% Design + engineering 92–94% Construction cost Works €280,000 (200 m² × €1,400/m²) design ≈ €17–22,000

Real example from the guide · figures depend on the case

The percentage tracks the scale

Where your project falls, between 3% and 12%

6–8% typical 0% 3% 12% ↓ lower — larger works, new build ↑ higher — small works, refurbishment, heritage

Four factors: complexity · size · use · phases

The order of the maths: fees are set from the construction cost — and it is precisely the architect’s work that keeps that cost within budget.

Three billing models

We choose the model that gives your case the most predictability.

01

Percentage of the construction cost

The most common and transparent method — fees follow the real scale of what is being designed.

02

Fixed fee

Agreed upfront from the brief. Full predictability on well-defined projects.

03

Hourly

For consultancy, technical opinions and small interventions — typically €50 to €150/hour.

The contract

Fees pay for a process, not a drawing.

A complete contract covers the base brief, the preliminary study, licensing (including submitting the process to the council), the execution design and technical assistance on site.

Always confirm separately: engineering (structure, services, thermal, acoustic), topographic survey, geotechnical study and site supervision — comparing proposals is only honest when it compares the same scope.

Request an estimate for my case

The contracted phases

  • 01Preliminary study — reading the site, brief and feasibility.
  • 02Licensing — design and submission of the council process.
  • 03Execution design — detailing and coordination of engineering.
  • 04Technical assistance — ensures what was designed is what gets built.

Phased with the work: a payment on appointment and instalments per completed phase.

Frequently asked

What clients usually ask us.

Why are there no longer fee tables?

They were abolished under competition law: each practice sets its own fees freely. Transparency today lives in the contract — scope, phases, deliverables and the calculation basis in writing.

Can I contract only the licensing?

You can, but it rarely pays off: the execution design is what protects the construction budget, and technical assistance is what ensures what was designed is what gets built.

Are fees paid all at once?

No — they are phased with the work: typically a payment on appointment and instalments per completed phase (preliminary study, licensing, execution, construction).

And for small remodelling jobs?

For smaller interventions a fixed fee or hourly rate is common, because the percentage of a small job does not cover the real technical hours.

Talk to the studio

Tell us what you want to build.

Send us the site and the brief. We’ll come back with an estimate of fees, timelines and scope — no obligation.

Request a proposal

Newsletter

© Tiago R. Correia Arquitectos. 2026 · Privacy Policy

Studio

Rua Lagares d'El Rey 19-A, Lisbon