The five phases of a real estate project: from feasibility to delivery

Sequência de esquisso, maqueta e fotografia da casa concluída sobre mesa de atelier — as fases de um projeto imobiliário
Process3 min readUpdated October 2026

Every real estate project — from a single house to a multi-unit development — goes through the same five phases. What sets the successful ones apart is the order of the decisions: each phase answers a question, and skipping questions is at the root of a large share of delays and cost overruns. Here is the full journey, from idea to delivery.

1. Feasibility — what is possible, and for how much

Everything starts with the right question: what can this plot or building become? Reading the PDM (municipal master plan) and the constraints, the indices, the programme scenarios and the first numbers. It is the lowest-cost phase of the whole process — and the one that most shapes the financial outcome. This is where a purchase is negotiated well or an expensive mistake avoided; it is precisely the work of LANDSCOPE.

2. Design — from concept to detail

Brief, preliminary study, developed design and detailed design, with the engineering disciplines coordinated from early on. The golden rule of 2026: with prior control reduced and the RGEU still in force until the new technical rules, the rigour of the design is the client’s main protection — and the quality of the detailed design is what keeps the construction budget on track.

3. Permitting — the right route, complete at first submission

Planning permission, prior notification or exemption: the route determines deadlines and risk. With DL 108/2026 in force since 1 October 2026, deadlines shorten and technical responsibility increases — the complete permitting guide explains the whole framework.

4. Construction — building what was designed

Specifications, careful selection of the contractor, a clear contract — and technical assistance from the design team through to the end. Overruns almost always stem from incomplete designs or improvised changes; a well-prepared construction phase is boring, and that is how it should be.

5. Delivery and value — the asset at work

Use permit, certifications, as-built drawings — and the product on the market. For a full cycle, plan for 24 to 48 months depending on scale; the numbers behind all of this are in the article on IRR and ROI.

“The five phases are not bureaucracy in series — they are five questions in the right order. Whoever answers them out of order pays to answer them twice.”

Tiago R. Correia

Architect

Frequently asked questions

Can I shorten the process?

You can cut the dead time — a complete application, disciplines in parallel, a strategic prior information request (PIP) — but not the phases. Skipping feasibility or saving on the detailed design usually proves expensive.

When should I involve the architect?

Before buying: phase 1 exists to protect the acquisition decision. After the deed, the room to optimise has already shrunk.

Does the process change for rehabilitation?

The phases are the same, with a reinforced diagnosis in phases 1 and 2 — including, where applicable, the seismic vulnerability assessment.

What phase is your project in?

From feasibility to delivery, we follow the full cycle — and we can step in at any phase with a diagnosis of what was left undone in the previous ones.

Talk to the studio

    No tags found

Newsletter

© Tiago R. Correia Arquitectos. 2026 · Privacy Policy

Studio

Rua Lagares d'El Rey 19-A, Lisbon