Architectural Design

ServiceStudio in Lisbon, since 2014Updated November 2026

An architectural design is the set of drawings and documents that defines the works and that the câmara municipal (municipal council) approves: plans, sections, elevations, a written report and, later, the engineering designs. We design houses, apartments, residential buildings and tourism projects in Portugal, from the first study to support during construction. This page explains what you receive at each stage, how long the municipality may take and how much it costs.

69projects since 2014
16municipalities
4stages, from preliminary study to construction
The essentials in 30 seconds
  • Four stages. Preliminary study, permitting, detailed design and construction support. Each stage can be contracted and paid for separately.
  • A single point of contact. The architecture and the engineering sit in the same BIM model, under one coordination.
  • Municipal time limits. Since 1 October 2026, planning permission is decided in 20 working days for the completeness check, 30 for the architecture and 20 for the final decision.
  • Fees. Between 3% and 12% of the construction cost; with engineering, typically 6 to 8%. The proposal sets the scope, stages and fees.

What you receive at each stage

A full contract covers four stages. At each one you know what has been decided, what you will receive and what is still to come.

  1. Preliminary study. We read the plot or the property, the brief and the rules of the municipal master plan (PDM). You receive the first design options, with areas, volumes and a construction cost estimate.

  2. Permitting. The written and drawn documents for the municipality: plans, sections, elevations and the written report. We file the application and reply to the official opinions until the decision.

  3. Detailed design. Construction details, bills of quantities and specifications, with the engineering coordinated. It is the basis for asking contractors for comparable quotes.

  4. Construction support. We answer the contractor’s questions and check that what is built is what was designed.

The architectural design does not come alone. Once the municipality approves the architecture, the engineering designs follow: structure, water and drainage, electrical, thermal, acoustic and gas, among others depending on the works. We coordinate them in a single BIM model, where clashes between the architecture and the engineering show up on the computer rather than on site.

Check separately in any proposal

The engineering designs, the topographic survey, the geotechnical study and site supervision. Two proposals can only be compared when they include the same scope; ours states in writing what is and is not included.

House, apartment or building: what changes

The studio’s portfolio by project type: 69 projects since 2014
  • 37 rehabilitations
  • 14 houses
  • 12 housing developments
  • 6 tourism projects

The stages are the same; what weighs most in each one changes.

Projects

Some projects from our portfolio, with the data from each project sheet:

How long municipal approval takes

The municipality’s time is set by law. Since 1 October 2026, under Decree-Law n.º 108/2026, planning permission is decided in stages, in working days:

Planning permission: maximum time limit for each stage, in working days
  1. Completeness checkRJUE, Art. 1120 days
  2. Decision on the architectureTacit approval · RJUE, Art. 2030 days
  3. Final decision, once the engineering designs are submittedTacit approval · RJUE, Art. 2320 days

With the engineering designs submitted with the application, that is 70 working days on paper. When external bodies have to be consulted, the assessment of the architecture only starts counting after the last opinion. The full figures, with fees, are in how much planning permission for a house costs; the choice of procedure, in planning permission or prior notification.

Before buying

If the plot or the property is not yet yours, the design starts by finding out what can be done there. LANDSCOPE analyses the plan and the constraints in 48 hours in the simple version or 5 working days in the complex one. To get the answer from the municipality itself, you file a prior information request.

How much an architectural design costs

Architects’ fees are, in most cases, between 3% and 12% of the estimated construction cost. With engineering included, the full design typically comes to between 6 and 8%. The percentage goes down as the works get larger and up for rehabilitation and heritage buildings.

Fees as a percentage of the construction cost
  • 3 to 12% in most cases
  • 6 to 8% typically, with engineering included

An example: for a 150 m² house with construction costing €240,000, the full design comes to between €14,400 and €19,200 + VAT. For small renovations a fixed fee is common, and for consultancy and expert opinions the hourly rate is typically between €50 and €150. Fees are paid in stages, as the work progresses.

The step-by-step calculation is in the article how much an architectural project costs, and the fee models on the fees page.

What to send to request a proposal

For us to reply with the procedure that applies and a proposal with scope, stages and fees, all we need is:

  • The location of the plot or the property.
  • The property’s tax record (caderneta predial).
  • What you intend to do: build, renovate, extend or change the use, and the approximate areas.
  • If you have them: existing plans, a topographic survey or photographs.
Frequently asked questions

How much does an architectural design for a house cost?

It depends on the construction cost and the stages contracted: in most cases, between 3% and 12% of the construction cost, and typically 6 to 8% with engineering. For a 150 m² house with construction costing €240,000, the full design comes to between €14,400 and €19,200 + VAT.

Is there still an official fee table for architects in Portugal?

There is no official table in force. The old 1972 calculation rules, written for public works, were revoked in 2008, and the Portuguese Order of Architects does not set fees. Each practice proposes its own; transparency lies in putting the scope, the stages and the calculation basis in writing.

How long does the municipality take to approve the design?

For planning permission, the legal time limits are 20 working days for the completeness check, 30 for the architecture and 20 for the final decision once the engineering designs are submitted, with tacit approval if the municipality does not decide (RJUE, Articles 11, 20 and 23). Consultations with external bodies add time.

Can I contract only the permitting stage?

You can, and the stages are independent. But it rarely pays off: the detailed design is what allows quotes to be compared and protects the construction budget, and construction support ensures that what is built is what was designed.

What does designing in BIM mean?

The building is modelled in three dimensions before construction. Clashes between the architecture and the engineering are found on the computer, quantities come out of the model and decisions are made on an accurate picture of what will be built.

Request a proposal

Ask for a proposal for your project

Tell us what you want to build or renovate, and where. We reply with the next steps and a proposal with the scope, phases and fixed fees.

    Prefer to talk now? +351 918 660 664geral@tiagorcorreia.com

    Official sources: Decree-Law n.º 108/2026 (RJUE republished: Articles 11, 20 and 23).