We are an architecture studio in Lisbon, on Rua dos Lagares d’El-Rei, in Alvalade. We handle the design and permitting of houses, the rehabilitation of apartments and residential buildings, and tourism projects, in Lisbon and the surrounding municipalities. From the first study to the construction site, you always deal with the architect who signs the design: Tiago R. Correia, registered with the Ordem dos Arquitectos (the Portuguese Order of Architects) under no. 23599.
The studio’s portfolio includes 37 rehabilitations, 14 houses, 12 housing developments and 6 tourism projects. We work on five fronts:
Some of the projects published in our portfolio, with the data from each one’s fact sheet:
Data from the fact sheets published on each project page, consulted in November 2026.
Bombarda 54 was covered by Jornal de Negócios and ECO in November 2024; the links to both articles are on The studio in the press.
Each municipality applies its own municipal master plan (plano director municipal, PDM) and its own regulations, and that is where a design is approved or held up. In Lisbon, besides the PDM, there is the Municipal Urbanisation and Building Regulation (Regulamento Municipal de Urbanização e Edificação, RMUEL). Three rules that weigh on rehabilitation:
In a listed building, or one in the process of being listed, even conservation works and interior alterations require planning permission; in the protection zone of a listed building, so do construction, extension, exterior alteration and demolition works (RJUE, Portugal’s legal regime for urbanisation and building, Article 4(2)(d), with the exceptions set out in the law). Knowing this before buying or designing saves months of process; it is what we check in LANDSCOPE, in 48 hours in the simple version or 5 working days in the complex one.
The process has five steps, and at each one you know what has been decided and what is still to come:
Conversation. We listen to what you are looking for and see what the plot or the property allows.
Preliminary study. Ideas become drawings and numbers: areas, volumes and a cost estimate.
Design. The complete design in BIM, with the engineering in the same model.
Permitting. We handle the process at the municipality, from the drawings to the replies to official opinions.
Construction. Technical assistance until handover.
The municipality’s time is set by law. Since 1 October 2026, under Decree-Law n.º 108/2026, planning permission is decided in stages, in working days:
With the engineering designs submitted with the application, that is 70 working days on paper. When external bodies have to be consulted, the assessment of the architecture only starts counting after the last opinion. The full figures, with fees and time limits, are in how much planning permission for a house costs; the choice between procedures, in planning permission or prior notification.
In practice
An apartment renovation may not need planning permission: interior alterations that do not touch façades or roofs are exempt, and the municipality is notified no later than five days before work starts (RJUE, Articles 6 and 80-A). If the works affect the structure, a structural design and a statement of responsibility (termo de responsabilidade) are added. Tell us what you plan to do and we will tell you which case applies to your project.
Architects’ fees are, in most cases, between 3% and 12% of the estimated construction cost; with engineering included, the full design typically comes to between 6 and 8%. For small renovations a fixed or hourly fee is common, and for consultancy and expert opinions the hourly rate is typically between €50 and €150. Fees are paid in stages, as the work progresses.
The step-by-step calculation is in the article on how much an architectural project costs, and the stages of a full contract on the fees page. Our proposal sets out the scope, the stages and fixed fees.
It depends on the construction cost and the stages contracted: in most cases, between 3% and 12% of the construction cost, and typically 6 to 8% with engineering. For a 150 m² house with construction costing €240,000, the full design comes to between €14,400 and €19,200 + VAT.
For planning permission, the legal time limits are 20 working days for the completeness check, 30 for the architecture and 20 for the final decision once the engineering designs are submitted, with tacit approval if the municipality does not decide (RJUE, Articles 11, 20 and 23). Consultations with external bodies add time.
Not always. Interior works that do not alter façades, heights or roofs are exempt from planning permission and prior notification; if they affect the structure, they need a structural design. The municipality is notified no later than five days before work starts. In listed buildings, or ones in the process of being listed, planning permission is required.
Yes. We have done 69 projects since 2014, in 16 municipalities, with regular work in Lisbon, Sintra, Cascais, Oeiras, Mafra and Alcobaça. The portfolio also includes projects in Loures, Vila Franca de Xira and Tavira.
You can, and that is when the answer is worth most. LANDSCOPE analyses the PDM and the constraints in 48 hours (simple) or 5 working days (complex). To get the answer from the municipality itself, you file a prior information request.
The location, the property’s tax record (caderneta predial) and what you intend to do: build, renovate, extend or change the use. Plans or a survey, if you have them, help. We reply with the procedure that applies and a proposal with scope, stages and fees.
Tell us what you want to build, rehabilitate or get permitted, and where. We reply with the procedure that applies, the next steps and a proposal with scope, stages and fixed fees.
Prefer to talk now? +351 918 660 664geral@tiagorcorreia.com
Official sources: Decree-Law n.º 108/2026 (RJUE republished: Articles 4, 6, 11, 20, 23 and 80-A) · Lisbon Municipal Urbanisation and Building Regulation, amendment published by Aviso n.º 16520/2021, Diário da República, 2nd series, no. 169, 31 August 2021 (Articles 13 and 14).